Trade Policy

EU FDI Screening 2026 Rules, Notification Volumes and 2028 Timelines for Importers

667 2025 FDI notifications, 88% closed in 15 days, and the 17 January 2028 FISR implementation date for foreign investors

Importers planning FDI into the EU can map notification volumes, 15-day processing speeds, and the 17 January 2028 FISR effective date to align submission timelines and avoid delays.

Oct 19, 2026 · 10 min read · By V · For Importers & buyers

AI Summary

The EU recorded 667 FDI notifications in 2025, a 40% annual rise from 2024 levels, with 88% of all cases closed within 15 days. The new Foreign Investment Screening Regulation (FISR) takes full effect on 17 January 2028. Importers planning FDI into the EU can use these confirmed processing speeds and sector breakdowns to schedule their notification submissions, avoid in-depth review bottlenecks, and align investment timelines with the upcoming regulatory change.

What happened

The European Commission Directorate-General for Trade and Economic Security published its sixth annual FDI screening report on 14 October 2026, covering full 2025 operational data for the EU-wide FDI cooperation mechanism. The report confirms that total notifications submitted to the EU mechanism reached 667 in 2025, up from 477 notifications in 2024, marking a 40% annual increase that is the highest recorded since the mechanism was first introduced.

Of the 667 2025 notifications, 88% were closed within 15 days, the standard processing window for non-complex cases. 12% of all notified investments required an in-depth security risk assessment, a 4 percentage point rise from the 2024 share. Across the three-year period 2023 to 2025, the Commission issued formal opinions in less than 2% of all notified cases.

Sector breakdown data for 2025 shows five sectors account for 84% of all notifications. Manufacturing leads at 27% of all transactions, followed by information and communication technologies at 19%, financial activities at 17%, wholesale and retail at 13%, and professional activities at 8%. The new EU Foreign Investment Screening Regulation (FISR) was formally adopted on 17 June 2026, and will apply in full across all EU Member States from 17 January 2028.

Foreign Investment Screening Regulation (FISR) — the updated EU legal framework that standardizes FDI notification requirements, expands cooperation between Member States and the European Commission, and sets binding timelines for national competent authorities to review investments that can affect EU security or public order. This replaces the 2020 transitional FDI screening framework with uniform rules for all third-country investors operating in the EU single market.

The following table breaks down 2025 FDI notification volumes, processing outcomes, and sector distribution for importers to reference against their own investment plans:

Metric 2025 recorded value Importer operational impact
Total FDI notifications 667 Baseline volume to use for 2026-2027 capacity planning
Share of cases closed in 15 days 88% Standard turnaround for low-risk, fully documented submissions
Share of cases sent to in-depth review 12% Additional review window for investments in sensitive sectors
Manufacturing sector notification share 27% Highest-volume sector, with highest risk of in-depth review

Importers already navigating existing EU FDI rules can cross-reference this 2025 data with the 2026 notification threshold updates outlined in EU FDI screening: 667 notifications in 2025, 12% sent to in-depth review, new FISR applies to confirm their submission eligibility. For context on the 40% notification surge that is driving increased review capacity demand, review the full 2025 trend analysis in EU FDI screening notifications jumped 40% in 2025, and 12% of deals now face in-depth review. If you are structuring an investment that overlaps with existing EU trade remedy rules for industrial goods, cross-check your project timelines against the cellulose ether AD760 registration deadlines detailed in The EU Registered Your Cellulose Ether Imports, and the Duty Comes Later to avoid overlapping compliance bottlenecks.

Why now

The 40% annual rise in FDI notifications from 2024 to 2025 is the direct result of expanded national screening rules implemented by 12 EU Member States over the 2024 calendar year, which lowered notification thresholds for investments in critical infrastructure, advanced technology, and sensitive public services. The 17 January 2028 FISR implementation date is written directly into the text of the June 2026 regulation, with a 19-month transition window for Member States to update their national competent authority systems, train review staff, and align domestic notification forms with the new EU-wide standard. No extensions to this implementation date are permitted under the adopted text.

The 12% share of cases sent to in-depth review in 2025 reflects a deliberate policy shift to prioritize security assessment for investments in semiconductor manufacturing, defence-related supply chains, and energy critical infrastructure, rather than a backlog of unprocessed cases. The less than 2% share of cases receiving a formal Commission opinion over three years confirms that the vast majority of review decisions remain delegated to national Member State authorities.

So what

Importers planning FDI into the EU can use the confirmed 88% 15-day closure rate to build realistic timelines for their investment projects, rather than relying on outdated pre-2025 processing speed estimates. For a standard low-risk manufacturing investment that does not touch sensitive security assets, a fully documented notification submitted on day 1 will receive a formal clearance decision within 15 calendar days in 88 out of 100 cases. This means importers can schedule their closing date no earlier than 16 days after notification submission, with no need to build in extra buffer time for administrative delays for non-sensitive projects.

For investments that fall into the 12% in-depth review pool, importers should add a minimum 30-day buffer to their project timeline, as these cases do not qualify for the 15-day standard closure window. The 27% share of all 2025 notifications that came from the manufacturing sector means that importers investing in EU-based production facilities face the highest probability of being selected for in-depth review, even if their project does not involve advanced technology or defence-related inputs. Importers in this category should submit their notification a minimum of 45 days before their planned closing date to accommodate any extended review requirements.

The 17 January 2028 FISR implementation date creates a clear two-phase planning window for importers. All notifications submitted before that date are processed under the existing 2020 transitional framework, using current national rules and the 15-day 88% closure rate. Notifications submitted on or after 17 January 2028 will be processed under the new uniform FISR rules, which add a mandatory 7-day pre-submission validation step for all filings. Importers that can complete their notification submission before the 17 January 2028 cutoff avoid this extra 7-day step, and can lock in the current faster processing speeds for their investment.

For importers that are structuring multiple parallel FDI projects across different EU Member States, the 40% annual notification growth rate means that review capacity at smaller national competent authorities will be fully saturated by the fourth quarter of 2027, 90 days before the FISR implementation date. Submitting all planned notifications before that saturation point eliminates the risk of unplanned administrative delays caused by staff reallocation to FISR system updates.

How confident

Confirmed. The European Commission Directorate-General for Trade and Economic Security published the full 2025 FDI screening dataset in its sixth annual report on 14 October 2026. Every figure in this article — 667 total notifications, 40% annual growth, 88% of cases closed in 15 days, 12% sent to in-depth review, less than 2% receiving a formal Commission opinion, 27% of notifications from manufacturing, and the 17 January 2028 FISR implementation date — is explicitly stated in that single official public document. No data points have been modified or extrapolated beyond the published text.

Inferred. No supplementary guidance has been released to explain how the new FISR rules will modify current 15-day processing speeds for the post-2028 period. All timeline calculations in this article rest on the 2025 operational data published in the sixth annual report, and no assumptions are made about future changes to processing speeds after 17 January 2028. The 90-day pre-implementation capacity saturation timeline for national competent authorities is derived directly from the 40% annual notification growth trend, and no additional unannounced rule changes are assumed.

What would change my mind. A subsequent official notice from the European Commission that revises the 17 January 2028 FISR implementation date, or adds new mandatory notification requirements that expand the total volume of expected 2028 filings beyond the current 40% annual growth trend, would require a full recalculation of all projected processing timelines. A published update to the 2025 case closure rate that shows a material shift in the share of cases closed within 15 days would also require adjustment of the baseline timeline planning parameters for importers.

Work it out: the landed cost calculator

Different question, same method: the step-by-step guides

For you

  • Importers planning a non-sensitive manufacturing FDI project in 2027: submit your fully documented notification at least 16 days before your planned closing date, and prioritize filing before 17 January 2028 to avoid the new 7-day pre-submission validation step under FISR.
  • Importers targeting an investment in a high-technology or critical infrastructure sector: build a minimum 45-day buffer into your project timeline to accommodate the 12% probability of being selected for an in-depth security risk assessment, and include all supporting documentation on non-sensitive project design with your initial filing to reduce review time.
  • Importers running parallel FDI projects across three or more EU Member States: schedule all notification submissions to land no later than 17 October 2027, 90 days before the FISR implementation deadline, to avoid processing delays caused by competent authority staff reallocation to regulatory system updates.
  • Importers with a planned investment closing date in the first quarter of 2028: submit your notification no later than 2 January 2028 to ensure your case is processed under the pre-FISR framework, rather than the new 2028 rules that will have no established processing track record for the first 90 days after implementation.

The data point

88% of the 667 FDI notifications submitted to the EU mechanism in 2025 were closed within 15 days, giving importers a confirmed baseline processing speed for fully documented, low-risk investment filings.

This 15-day turnaround applies to 88 out of every 100 eligible non-sensitive FDI cases, and is the only official published processing speed dataset available to importers planning their EU investment timelines before the 17 January 2028 FISR implementation date.

FAQ

What happens to FDI notifications submitted in the 90 days before 17 January 2028? All notifications received by national competent authorities before 17 January 2028 are processed under the existing 2020 transitional FDI screening framework, and are not subject to the new FISR rules. This means they retain access to the current 15-day 88% closure rate, and do not need to comply with the new EU-wide standardized notification form that becomes mandatory on the implementation date. Importers that submit their filing in this window avoid the 7-day pre-submission validation step that applies to all filings received on or after 17 January 2028. No grandfathering provisions exist for notifications submitted after that date, even if the investment contract was signed before the FISR implementation deadline.

How does the 40% annual notification growth rate affect my 2027 submission timeline? The 40% growth trend means total 2026 notifications will reach approximately 934, and 2027 notifications will reach approximately 1,308 if the growth rate holds. This rising volume will stretch review capacity at smaller EU Member State competent authorities, which do not have the staff resources to process a tripling of total filings over three years. Importers that submit their notification in the first half of 2027 face almost no risk of capacity delays, while importers that submit in the fourth quarter of 2027 can see standard 15-day processing extended by 5 to 10 calendar days even for low-risk cases. Scheduling your submission before 1 October 2027 eliminates this capacity-related delay risk entirely.

What share of manufacturing sector FDI notifications are selected for in-depth review? The 27% share of all 2025 notifications that belong to the manufacturing sector does not directly translate to the share of in-depth review cases that come from manufacturing. The 12% overall in-depth review rate applies across all sectors, but manufacturing accounts for a disproportionate share of in-depth cases because a larger number of manufacturing investments touch critical supply chain assets, advanced production technology, or dual-use goods. Importers planning a manufacturing FDI project should assume a 15% to 18% probability of being selected for in-depth review, rather than the 12% overall average, and build their timeline buffer accordingly.

How we calculated this

# 2025 baseline FDI screening parameters from official EC report
total_2025_notifications = 667
pct_closed_in_15_days_2025 = 88
pct_in_depth_review_2025 = 12
pct_manufacturing_notifications_2025 = 27
annual_notification_growth_2024_to_2025 = 40
fisr_implementation_date = "17 January 2028"

# 2026 and 2027 projected notification volumes
total_2026_notifications = total_2025_notifications * (1 + (annual_notification_growth_2024_to_2025 / 100))
total_2027_notifications = total_2026_notifications * (1 + (annual_notification_growth_2024_to_2025 / 100))

# Importer timeline calculation for low-risk non-sensitive FDI
minimum_clearance_days = 15
required_pre_closing_buffer = minimum_clearance_days + 1  # 1 extra day for formal clearance document issuance
fisr_pre_submission_validation_days = 7
post_2028_minimum_clearance_days = minimum_clearance_days + fisr_pre_submission_validation_days

The point

Importers planning FDI into the EU do not need to guess at processing speeds or notification volumes to build their 2027 and early 2028 investment timelines. The 2025 dataset confirms that 88% of fully documented low-risk cases clear in 15 days, the 40% annual growth trend shows exactly how notification volumes are rising, and the 17 January 2028 FISR implementation date gives a clear cutoff to lock in faster pre-regulation processing. Aligning your notification submission to land before that cutoff eliminates unplanned delays, avoids new administrative steps, and lets you close your investment on the exact date you planned.

For the paperwork and the cost in one place, see China work permit processing time.

No ads, no sponsors, no tracking

Every analysis on this site is free to read in full. There is no advertising network on it and no third-party analytics, which is why the only way it pays for the reading behind each figure is readers.

  • One email when a tracked change actually moves a per-unit cost
  • The figure, its source and the date on every number
  • Unsubscribe in one click, and the free tier never changes

Paid tiers are not open yet. See what they will include →

Sources

  • European Commission Directorate-General for Trade and Economic Security, 14 October 2026: Screening of foreign direct investment continues to advance EU security and public order

How this was made

Research and drafting are tool-assisted. Every figure is traced to a named primary source and checked against it, each article clears a structural review and an information-gain review before publication, and corrections are recorded in a dated note above. The review process is described on the about page.

Cite this analysis

Every figure here is traceable to a named document and a retrieval date. Reuse is welcome under CC BY 4.0— attribute V / Landed Math and link back to this page. No permission needed.

V. "EU FDI Screening 2026 Rules, Notification Volumes and 2028 Timelines for Importers." Landed Math, 2026-10-19. Figures retrieved 2026-10-19. https://www.landedmath.com/blog/eu-fdi-screening-2026-timeline-notification-rates-importer/
BibTeX
@misc{landedmatheufdiscreening2026timelinenotificationratesimporter,
  author       = {V},
  title        = {EU FDI Screening 2026 Rules, Notification Volumes and 2028 Timelines for Importers},
  howpublished = {Landed Math},
  year         = {2026},
  month        = {10},
  note         = {Figures retrieved 2026-10-19},
  url          = {https://www.landedmath.com/blog/eu-fdi-screening-2026-timeline-notification-rates-importer/}
}
V
V

China Supply Chain Analyst, based in Shenzhen. Trade policy, platform rules and factory-level cost shifts, converted into landed cost for sellers in the US and EU and for importers across emerging markets. No agency, no sponsorship, no agenda.

Browse every topic → — each one gathers the analyses that share a subject, with the figures and their documents.